Railway Bridge under construction

Object type
Photograph
Production date
1908
See full details

Object Detail


Description
Looking south west. This is most likely a track maintenance gang replacing rails on the Hamilton Railway Bridge.
Secondary production person and role
Tibbutt & Co
Accession number
HCL_07949

Colours

Object type

Share

Rights

Many of the collection images are protected by copyright. For queries about permission to use images, please contact heritage@hcc.govt.nz.

Comments


This bridge was originally built piers consisting of two columns. However the bridge was too unsteady and used to sway with a train in windy situations. Guy ropes were tried but were not successful. Around the time the NIMT was opened, larger locomotives were used and this bridge stopped them being used on the Rotorua trains. Around 1908, the bridge had an extra pier added plus new trusses and the deck was moved over to the center of the widened structure. This photo was taken during that job, note the new widened concrete abutment, the top of the new pier and the sections of the new truss on the walkway.

- Ken Ashman

Posted on 27-08-2021 22:42:16